CASE STUDY: K1 SPEED
40+ LOCATIONS WORLDWIDE
K1 Speed updated all of their locations starting in 2012 and now they use Protex exclusively. With their old barrier system, if there was an incident, the track workers had to work in between heats to straighten out the track – or worse, stop the race to fix the barriers. With Protex installed, they have been able to increase their heats run per hour and increase profitability.
K1 Speed West Palm Beach, Florida USA
K1 Speed Bluffton, South Carolina
ARE YOU WASTING TIME AND MONEY FIXING BARRIERS?
Request a quote right here, right now.